One Big Change Kenya logoOne Big Change™ Kenya
Appendix 7

Traction Partner & Resource Mobilisation Framework

How One Big Change Kenya identifies, mobilises, governs, matches, deploys and reports resources contributed by organisations outside the core Government commission - so the Change Lens identifies the barrier and the right partner helps remove it, rather than schools becoming supplier-led or donor-led. One Big Change Kenya, September-December 2026.

1. Purpose of this Appendix

This Appendix sets out how One Big Change Kenya will identify, mobilise, govern, match, deploy and report resources contributed by organisations outside the core Government commission.

The Traction Partner model is intended to address a central implementation challenge:

Schools may know what needs to change but lack the money, equipment, expertise, infrastructure, technology or relationships required to make that change possible.

One Big Change therefore separates two functions.

Government Programme Commission

Funds the implementation infrastructure required to:

  • diagnose
  • coordinate
  • support schools
  • build capability
  • gather evidence
  • establish Hubs
  • manage implementation
  • report nationally

Traction Partner Resource Pool

Brings additional:

  • finance
  • equipment
  • technology
  • infrastructure
  • expertise
  • research
  • professional development
  • services
  • connectivity
  • other practical resources

The intention is not to substitute Government responsibility. It is to make better use of the wider resources available across Kenyan society.

2. Core Traction Partner Principle
The Change Lens identifies the barrier. The Traction Partner helps remove it.

Resources therefore follow evidenced need. They do not determine the need. This distinction protects the programme from becoming supplier-led, sponsor-led or donor-led.

3. The Problem the Model Addresses

Kenyan schools interact with many potential sources of support:

  • Government
  • businesses
  • foundations
  • development organisations
  • NGOs
  • universities
  • technology companies
  • employers
  • professional associations
  • community organisations
  • philanthropists

However, support can become fragmented. A school may receive:

  • devices without teacher capability
  • software without connectivity
  • equipment without maintenance
  • training unrelated to its priority
  • duplicated interventions
  • short-term projects with no continuation plan

The One Big Change approach seeks to move from:

From

Available intervention looking for a school

To

Evidenced school need looking for the right response

4. What is a Traction Partner?

A Traction Partner is an organisation that contributes resources, expertise or capability to help remove an evidenced implementation barrier. A Traction Partner may be:

  • corporate
  • foundation
  • NGO
  • social enterprise
  • university
  • employer
  • professional body
  • technology company
  • infrastructure provider
  • financial institution
  • community organisation
  • philanthropic organisation
  • development organisation

Participation is based on relevance to identified need.

5. What a Traction Partner is Not

A Traction Partner is not automatically:

  • a programme funder
  • a programme supplier
  • a Government contractor
  • a sponsor with unrestricted access to schools
  • an education-policy adviser
  • an owner of programme evidence
  • an organisation entitled to sell products to schools
  • a decision-maker regarding school selection

Those roles must remain clearly separated.

6. Types of Traction Contribution

Traction Partner contributions may include six broad categories.

1. Finance

  • implementation grants
  • programme sponsorship
  • school activation support
  • research funding
  • event funding

2. Physical Resources

  • equipment
  • devices
  • laboratory resources
  • furniture
  • learning materials
  • assistive technology

3. Infrastructure

  • connectivity
  • energy
  • classroom infrastructure
  • technical facilities
  • digital infrastructure

4. Knowledge and Expertise

  • teacher development
  • leadership support
  • specialist expertise
  • technical assistance
  • mentoring

5. Technology

  • software
  • licences
  • platforms
  • technical support
  • digital tools

6. Networks and Opportunities

  • employer relationships
  • pathways
  • work exposure
  • university links
  • professional networks
  • community connections
7. Traction Partner Delivery Chain

The Traction Partner mechanism follows a defined sequence.

School Change Lens

↓

Barrier identified

↓

Priority agreed

↓

Capability/resource gap identified

↓

Needs specification produced

↓

Potential partners identified

↓

Due diligence

↓

Partner matched

↓

Contribution agreed

↓

Resource deployed

↓

Use monitored

↓

Outcome evidenced

↓

Learning recorded

A contribution should not bypass this sequence simply because a partner wants to provide something quickly.

8. School Needs Profile

Each founding school will produce a structured resource-needs profile. The profile should include:

  • school
  • One Big Change priority
  • identified barrier
  • required response
  • resource category
  • quantity or scope
  • estimated value
  • urgency
  • implementation owner
  • sustainability implications
  • evidence measure
9. National Needs Matrix

The ten individual profiles will feed into one Founding Programme Needs Matrix.

NeedSchools AffectedTypePriorityEstimated RequirementPotential Partner TypeStatus
Example capability needTBDExpertiseTBDTBDProfessional/UniversityTBD
Example equipment needTBDPhysicalTBDTBDCorporate/FoundationTBD
Example connectivity needTBDInfrastructureTBDTBDTechnology/TelecomTBD

The actual matrix will be populated from founding evidence. It will not be filled with assumed needs before the Change Lens is completed.

10. Aggregating Demand

One of the potential advantages of the Hub model is the ability to aggregate similar school needs. For example, if one school requires a particular capability, the response may be expensive. If thirty schools require the same capability, it may be possible to create:

  • shared training
  • negotiated licences
  • pooled equipment
  • regional expertise
  • Hub-based support

The founding programme will therefore examine where individual school needs can be converted into collective demand.

11. Resource Categories

Every need should be classified as one of the following:

School Can Resolve Internally

No external resource required.

Programme Capability Required

One Big Change implementation support.

Government/System Support Required

Issue requires relevant public-sector response.

Expert Capability Required

Specialist knowledge.

Traction Partner Resource Required

Suitable external resource or contribution.

Mixed Response

More than one route required.

This prevents every implementation barrier from being automatically turned into a sponsorship request.

12. Traction Partner Pipeline

The programme will maintain a structured partner pipeline. Suggested stages:

1

Stage 1 - Identified

Potentially relevant organisation.

2

Stage 2 - Researched

Basic suitability established.

3

Stage 3 - Qualified

There is credible alignment with an evidenced need.

4

Stage 4 - Engaged

Initial conversation has taken place.

5

Stage 5 - Proposition Developed

Specific contribution proposed.

6

Stage 6 - Due Diligence

Required checks completed.

7

Stage 7 - Commitment

Written commitment agreed.

8

Stage 8 - Activated

Resource deployed.

9

Stage 9 - Evidenced

Contribution and outcome reported.

10

Stage 10 - Renewal / Expansion

Future relationship considered.

13. Founding-Phase Partner Targets

During the 90-day programme the initial operational targets are:

MeasureFounding Target
School resource-needs profiles10
National needs matrix1
Potential Traction Partners identifiedMinimum 20
Qualified partner conversationsMinimum 10
Needs mapped to potential partner categories100% of evidenced needs
Written commitmentsActual results reported
Cash/in-kind resources mobilisedActual verified value reported

The programme should not set an artificial cash target for the founding phase that encourages poor-fit partnerships.

14. Partner Prioritisation

A potential partner should be assessed according to:

  • relevance
  • capability
  • reputation
  • geographic reach
  • financial/resource capacity
  • safeguarding suitability
  • sustainability
  • alignment with identified need
  • conflicts
  • evidence expectations
  • ability to scale
  • willingness to work within programme governance
15. Partner Fit Score

An internal partner assessment may use:

Strong Fit

Clear contribution to evidenced priority.

Potential Fit

Relevant capability but further discussion required.

Limited Fit

Some relevance but weak additional value.

Not Suitable

Contribution creates unacceptable risk or does not meet identified need.

This is an internal decision-support mechanism, not a public ranking of organisations.

16. Due Diligence

Before material partner activation, appropriate due diligence should consider:

  • legal status
  • ownership
  • reputation
  • financial standing where relevant
  • safeguarding
  • data practices
  • sanctions or significant legal concerns where applicable
  • conflicts of interest
  • relevant experience
  • capability to deliver
  • commercial intentions
  • political exposure where relevant
  • proposed school access

The depth of due diligence should be proportionate to the relationship.

17. Commercial Interests

A company may legitimately have a commercial interest in education. That does not automatically make it unsuitable. However, the programme must distinguish between:

Contribution

Resource provided to support the identified programme need.

Sale

A commercial procurement decision.

Traction Partner status does not grant preferential supplier status.

18. Procurement Firewall

Where a Traction Partner also wishes to sell goods or services into the programme or Government-funded activity:

  • the potential conflict must be disclosed
  • procurement requirements must be followed
  • Traction Partner status must not give an unfair advantage
  • relevant decision-makers with conflicts should withdraw
  • documentation should show how the decision was reached

Contribution must not become a back door into public procurement.

19. Public-Sector Influence

Traction Partners must not receive:

  • preferential Government access
  • influence over procurement
  • influence over programme findings
  • influence over Government policy
  • guaranteed future contracts

in exchange for resources. No partner payment or contribution should be structured as consideration for influencing a public official.

20. School Access

Traction Partner status does not provide unrestricted access to:

  • learners
  • teachers
  • school data
  • parent contact information
  • school communications
  • classrooms

Access must be necessary for the agreed contribution and subject to school, safeguarding and programme controls.

21. Branding

Partner visibility should be proportionate to contribution and context. Possible recognition may include:

  • programme reports
  • partner acknowledgement
  • LocaeFest
  • agreed communications
  • impact summaries

It should not result in schools becoming advertising environments.

22. No Direct Marketing to Learners

Participation in One Big Change should not be used to:

  • collect learner contact information
  • target learners commercially
  • create advertising audiences
  • promote inappropriate products
  • circumvent school procurement processes

This principle applies particularly where technology providers participate.

23. Partner Agreement

A material Traction Partner relationship should be documented. Agreements may cover:

  • contribution
  • value
  • purpose
  • beneficiaries
  • delivery schedule
  • responsibilities
  • safeguarding
  • data
  • branding
  • evidence
  • procurement separation
  • conflicts
  • intellectual property where relevant
  • termination
  • reporting
24. Cash Contributions

Cash contributions should be recorded separately from:

  • Government commission income
  • school activation funds
  • in-kind contributions
  • commercial procurement

Restricted funding must be used for its agreed purpose.

25. In-Kind Contributions

In-kind resources may include:

  • equipment
  • staff time
  • technology
  • training
  • facilities
  • services

The programme will record:

  • description
  • quantity
  • source
  • beneficiary
  • valuation methodology
  • delivery date
  • restrictions
  • evidence
26. In-Kind Valuation

In-kind value should not be inflated for publicity. Valuation should use a reasonable basis such as:

  • market price
  • normal selling price
  • documented service rate
  • verified cost
  • equivalent procurement cost

The valuation method should be recorded.

27. Verified vs Indicative Value

Partner reporting will distinguish:

Indicative

Potential or proposed value.

Committed

Written commitment exists.

Delivered

Resource has been provided.

Verified

Receipt/use has been confirmed.

Only delivered or verified contributions should be included in realised mobilisation figures.

28. Resource Leverage Ratio

The programme will calculate:

Verified additional resource value mobilised ÷ relevant Government programme expenditure

This is the resource-leverage ratio. It is one measure of value for money. It is not the only measure.

A programme that mobilises expensive but irrelevant equipment does not represent good value simply because the ratio is large.

29. Quality over Quantity

Resource mobilisation should be judged on:

  • relevance
  • utilisation
  • implementation impact
  • sustainability
  • additionality

Not simply total monetary value.

KSh 10 million of highly relevant capability may create more impact than KSh 100 million of poorly matched resources.

30. Additionality

The programme should determine whether a contribution is genuinely additional. For example:

  • Would the partner have provided it anyway?
  • Is One Big Change redirecting existing activity?
  • Is the programme creating a new contribution?
  • Is it improving targeting?
  • Is it increasing scale?
  • Is it connecting previously fragmented work?

This distinction strengthens the credibility of partner-impact reporting.

31. Resource Dependency

Before accepting a resource, the programme should ask:

  • Can the school maintain it?
  • What happens when the free period ends?
  • Is connectivity required?
  • Are licences renewable?
  • Who owns the asset?
  • Who repairs it?
  • Is staff training required?
  • Does implementation depend permanently on the partner?

Resources that create unsustainable dependency may be rejected or redesigned.

32. Asset Ownership

Where equipment is provided, the agreement should clarify:

  • legal owner
  • custodian
  • beneficiary
  • asset-record requirement
  • maintenance responsibility
  • replacement
  • disposal

Government-funded and partner-funded assets must remain distinguishable where required.

33. Technology Partners

Technology partnerships require particular scrutiny. Questions should include:

  • Is the tool actually required?
  • Does it work in the school's connectivity environment?
  • What data does it collect?
  • Where is data hosted?
  • Who owns the data?
  • What happens when the licence ends?
  • What training is required?
  • Can the school afford continuation?
  • Is there vendor lock-in?

Technology should solve an implementation problem rather than create a new one.

34. University and Knowledge Partners

Universities may contribute:

  • research
  • evidence
  • practitioner development
  • evaluation
  • specialist knowledge
  • recognition
  • student or academic expertise

Their role should be defined according to actual contribution.

A university logo is not a substitute for meaningful involvement.

35. NGO and Development Partners

One Big Change should seek to coordinate with existing programmes rather than duplicate them. Where an NGO or development organisation is already addressing an identified barrier, the programme may:

  • connect the school
  • align activity
  • share learning where appropriate
  • avoid unnecessary duplicate expenditure

One Big Change does not need to own every intervention.

36. Community and Local-Business Participation

Not all resources need to come from large national organisations. Future LocaeHubs may mobilise:

  • local employers
  • professional services
  • local businesses
  • alumni
  • community institutions
  • parents
  • local expertise

This reinforces the principle of Harambee and local capability.

Local contribution must remain subject to safeguarding, transparency and conflict controls.

37. Expert Contributions

An expert may contribute:

  • pro bono time
  • subsidised time
  • fully funded support
  • commercially contracted support

The programme should record the basis clearly.

Experts should not be expected to work indefinitely without remuneration simply because the programme has social purpose.

38. Partner Matching Process

For each identified need, the programme will ask:

What precisely is required?

↓

Is there an existing public provision?

↓

Can the school solve it?

↓

Can another founding school share capability?

↓

Is there an existing programme already addressing it?

↓

Is a Traction Partner required?

↓

Which partner is best suited?

This prevents unnecessary external dependency.

39. Traction Partner Round Tables

During the founding phase, One Big Change may convene targeted resource round tables. These should be organised around needs, not generic sponsorship. For example:

Digital and Connectivity Round Table

Teacher Capability Round Table

STEM and Technical Pathways Round Table

Inclusion and Assistive Technology Round Table

Wellbeing and Support Round Table

The founding Change Lens evidence determines which round tables are actually required.

40. Partner Portfolio

A mature national model should seek a diversified portfolio. Dependence on one corporate or foundation creates risk. The portfolio should ideally include a mix of:

  • Government
  • private sector
  • foundations
  • universities
  • development organisations
  • local partners
  • professional expertise
41. Year 1 Resource Pool

Subject to the December Decision Gate, Year 1 may establish a formal One Big Change Kenya Traction Partner Resource Pool. This would coordinate contributions around:

50 LocaeHubs

approximately 500 Core Implementation Schools

6,000 Connected Schools

The pool may contain:

  • cash
  • in-kind resources
  • expertise
  • services
  • infrastructure commitments

It should not necessarily operate as one central bank account. Different contributions may be delivered through different controlled mechanisms.

42. Year 1 Resource Mobilisation Ambition

The working strategic ambition is for the national programme to mobilise substantial additional resources alongside the core Government commission. An indicative planning range of approximately:

KSh 1 billion to KSh 3 billion in additional cash and in-kind resource value

may be tested during Year 1 planning.

This is not a guaranteed partner commitment and should not be presented as secured funding. The founding programme must determine whether this ambition is realistic.

43. Why the Range Must be Tested

The amount that can responsibly be mobilised depends on:

  • evidenced school needs
  • number and maturity of Hubs
  • partner appetite
  • Government alignment
  • implementation capacity
  • infrastructure requirements
  • ability to absorb resources effectively

The final mobilisation target should therefore be established at the Decision Gate.

44. Government Value Proposition

The Traction Partner model potentially enables Government to commission implementation infrastructure while leveraging wider society for additional implementation resources. Government is therefore not necessarily being asked to finance every:

  • device
  • laboratory
  • licence
  • specialist
  • infrastructure requirement

through the One Big Change commission. The programme instead creates a disciplined mechanism for identifying what is needed and finding the most appropriate source.

45. Government Does Not Lose Control

External resource mobilisation does not transfer education-policy authority to private partners. Government remains responsible for its statutory mandate. Traction Partners participate within the programme architecture. They do not become parallel policymakers.

46. LocaeHub Resource Function

If the model scales, each LocaeHub may eventually maintain a local resource picture showing:

  • common needs
  • available expertise
  • local businesses
  • partner opportunities
  • shared resources
  • unmet requirements

This allows more needs to be resolved locally before they reach national level.

47. National Resource Intelligence

At scale, aggregated Change Lens information may allow One Big Change to identify patterns such as:

  • repeated equipment gaps
  • widespread capability needs
  • regional connectivity barriers
  • recurring inclusion needs
  • professional-development demand

Appropriate aggregated information can then be used to design larger partner propositions.

Individual school or learner data should not be unnecessarily exposed.

48. Traction Partner Dashboard

The programme should maintain a dashboard covering:

Pipeline

  • identified
  • qualified
  • engaged
  • proposition
  • committed
  • activated

Contribution

  • cash
  • in-kind
  • expertise
  • technology
  • infrastructure

Allocation

  • school
  • Hub
  • national

Value

  • indicative
  • committed
  • delivered
  • verified

Evidence

  • intended outcome
  • actual use
  • implementation result
49. Monthly Reporting

Monthly partner reporting should include:

  • new partners identified
  • qualified conversations
  • propositions issued
  • commitments
  • resources deployed
  • verified resource value
  • risks
  • conflicts
  • next actions

Government reporting should focus on programme-level value rather than disclose commercially sensitive partner negotiations unnecessarily.

50. Impact Reporting

Every significant contribution should eventually answer:

1What need was identified?
2Why was this response chosen?
3What was contributed?
4What was its verified value?
5Who received it?
6Was it used?
7What changed?
8Is it sustainable?
9What was learned?
51. Traction Partner Evidence Standard

A photograph of equipment being handed over is not sufficient evidence of impact. Evidence should distinguish:

Delivered

↓

Used

↓

Useful

↓

Impactful

This distinction is central to the One Big Change model.

52. Partner Renewal

Partner renewal or expansion should consider:

  • delivery quality
  • evidence
  • school feedback
  • safeguarding
  • value
  • sustainability
  • fit with future priorities

A large contribution does not guarantee continued partner status.

53. Partner Exit

The programme should be able to end a relationship where:

  • contribution is not delivered
  • conduct creates safeguarding risk
  • data is misused
  • commercial pressure becomes inappropriate
  • conflicts are unmanaged
  • political activity compromises neutrality
  • reputational risk becomes unacceptable
  • partner influence threatens evidence integrity

Exit provisions should appear in significant partner agreements.

54. LocaeAwards and Partners

Traction Partners may support LocaeAwards, but sponsorship must not influence award outcomes. A sponsoring organisation should not:

  • select winners for commercial reasons
  • require its customer schools to win
  • use awards as a sales incentive
  • alter judging criteria

Recognition must remain evidence-based.

55. LocaeFest and Partners

LocaeFest may provide an opportunity for partners to:

  • share implementation learning
  • demonstrate useful resources
  • participate in practical conversations
  • support schools
  • hear research findings

It should not become a conventional trade exhibition in which access to decision-makers is effectively sold.

56. Partner Communications

All public partner communications should distinguish:

Conversation

Initial engagement.

Collaboration

Defined activity.

Traction Partner

Agreed contribution.

Strategic Partner

Material, ongoing relationship.

Funder

Confirmed financial contribution.

These terms should not be used interchangeably.

57. Intellectual Property

Participation as a Traction Partner does not automatically transfer ownership of:

  • One Big Change
  • the Change Lens
  • programme methodology
  • national programme data
  • programme branding

Partner intellectual property remains subject to its own agreement.

58. Confidential Information

Partners may receive information necessary to respond to an identified need. They should not automatically receive:

  • full school diagnostics
  • confidential school data
  • individual learner information
  • unrestricted programme datasets

Information sharing should follow need-to-know principles.

59. Accountability

Overall executive accountability

Kenya Managing Director / CEO

Commercial and Traction Partner strategy

Commercial & Strategic Partnerships Lead

Proposed founding lead: Kugan

Financial/resource architecture

Finance, Resources & Investment Lead

Proposed founding lead: Graham

School-needs validation

Education & Implementation Director

Institutional relationships

Strategic Partnerships & Institutional Relations - Kenya

Evidence

Evidence, Research & Learning Lead

Finance/control

Designated Finance Function

Legal agreements

Kenyan Legal & Governance Counsel

60. Founding Phase Success Test

The Traction Partner mechanism will be considered promising if the founding programme can demonstrate that:

  • school needs can be identified consistently
  • needs can be converted into clear resource specifications
  • appropriate partners can be found
  • contributions can be governed transparently
  • schools receive resources relevant to their priority
  • those resources are actually used
  • additional value can be measured
  • partner involvement does not distort school priorities
  • partner contributions do not undermine Government authority
  • the model can plausibly operate through future LocaeHubs
61. Year 1 Decision Questions

At the December Decision Gate, Government and programme leadership should be able to answer:

1What resource needs emerged across the ten schools?
2Which could schools solve themselves?
3Which required Government intervention?
4Which were suitable for Traction Partners?
5How much additional value was actually mobilised?
6Which partner categories were most useful?
7Which partnership approaches failed?
8What safeguards were required?
9What could be aggregated through Hubs?
10What national resource pool would be realistic?
11What Year 1 mobilisation target is credible?
12What additional partner infrastructure is required?
62. Core Traction Partner Promise
One Big Change does not begin by asking what a partner wants to give. It begins by asking what a school needs to make implementation work.

The Change Lens identifies the barrier. The school and programme agree the priority. Government maintains the national direction. The right partner helps remove the barrier. And evidence determines whether the resource actually made a difference.